Laserfiche WebLink
Table 4 <br /> Martin Marietta <br /> Upper Poudre Combined Sites <br /> Recharge Ponds Accretions <br /> 2015 Deliveries= 122.71 acre-feet <br /> Total Taylor& Estimated Return <br /> Net Lagged Recharge Return Flow Net Recharge <br /> Month Gill FHG Recharge Ponds Flow <br /> Deliveries Evaporation Recharge Credit Accretion Factor Obligations Accretion <br /> (acre-feet) (acre-feet) (acre-feet) (acre-feet) (%) (acre-feet) (acre-feet) <br /> (A) (B) (C) (D) (E) (F) (G) <br /> Jan-16 0.00 0.00 6.92 _ 0.41% 0.50 6.42 <br /> Feb-16 0.00 0.00 5.64 0.34% 0.41 _ 5.23 <br /> Mar-16 0.00 0.00 4.66 0.28% 0.34 4.31 <br /> Apr-16 0.00 0.00 0.00 3.84 53.72% 0.00 3.84 <br /> May-16 10.00 0.57 9.43 4.95 . 62.90% 6.29 -1.34 <br /> Jun-16 15.00 0.69 14.31 7.74 37.92% 5.69 2.05 <br /> Jul-16 27.00 0.71 26.29 11.99 40.70% 10.99 1.00 <br /> Aug-16 30.00 0.64 29.36 16.60 42.92% 12.87 3.73 <br /> Sep-16 37.00 0.48 36.53 20.91 47.22% 17.47 3.44 <br /> Oct-16 10.83 0.33 10.50 19.61 0.04% 0.06 19.56 <br /> Nov-16 0.00 0.00 13.300.75% 0.97 12.33 <br /> Dec-16 0.00 0.00 9.07 - 0.51% 0.67 8.40 <br /> Total 129.83 3.42 126.41 125.23 - 56.27 68.96 <br /> Notes: <br /> (A)Total average farm headgate deliveries(FHG)to the recharge ponds based on HCU for portion of Taylor and Gill Ditch water <br /> sent to the recharge ponds. <br /> (B)Evaporation estimated based on total recharge pond surface area when deliveries are being made.Surface area of recharge ponds <br /> are expected to be 1.5 acres during the 2016 irrigation season. <br /> (C)Equals(A)-(B) <br /> (D)Lagging calculations were based on the following parameters: <br /> Distance from stream=2,300 ft,Transmissivity=160,000 gpd/fl,Specific Yield=0.2,No-flow Boundary=6,500 ft <br /> (E)Return flow factors are based on HCU analysis conducted by Appelgate Group,Inc for the 5.75 shares of Taylor and Gill Ditch W; <br /> (F)January-March=(2015 Deliveries*(E)),April-September=(B)*(E),October-December=(2016 Deliveries*(E)). <br /> (G)Equals(D)-(F) <br /> BBA <br />