Laserfiche WebLink
Mr. Wayland Page 4 of 6 • <br /> Goose Haven #2 Expansion SWSP <br /> February 1, 2016 <br /> 4. The total amount of water used for dust control at the site during 2016 must not exceed <br /> 3.75 acre-feet. All pumping for dust control will be tracked by the operator by keeping a <br /> log of number of fills the water truck makes. This shall be included on submitted <br /> accounting. A totalizing flow meter may be required on dust control operations at the <br /> discretion of the water commissioner or division engineer. <br /> 5. The total amount of water lost in aggregate production at the site during 2016 must not <br /> exceed 11.77 acre-feet. <br /> 6. Total consumption at the site must not exceed the aforementioned amounts unless an <br /> amendment is made to this plan. <br /> 7. Approval of this plan is for the purposes as stated herein. Any additional uses of this <br /> water must first be approved by this office. <br /> 8. All releases of replacement water must be sufficient to cover all out-of-priority depletions <br /> in time, place, and amount and must be made under the direction and/or the approval of <br /> the water commissioner. The release of replacement water may be aggregated to <br /> maximize beneficial use. The water commissioner and/or the division engineer shall <br /> determine the rate and timing of an aggregated release. <br /> 9. As long as dewatering remains continuous, the net accretions should be sufficient to <br /> replace the lagged depletions. At least three years prior to the planned cessation of <br /> dewatering, the operator must submit a dewatering analysis that shows how post <br /> pumping depletions will be replaced. As this analysis requires knowledge of the total <br /> volume dewatered, all dewatering activities must be metered with a totalizing flow meter <br /> that is recorded and reported on the submitted monthly accounting. <br /> 10. All diversions shall be measured in a manner acceptable to the division engineer. The <br /> Applicant shall install and maintain such measuring devices as required by the division <br /> engineer for operation of this SWSP. In addition, the applicant shall maintain daily <br /> records of all diversions, replacements, and the amount of water used for each particular <br /> purpose. The applicant shall provide a report of these records to the division engineer <br /> (Div1Accountinqstate.co.us) and the water commissioner (Bob Carlson at <br /> Bob.Carlsonstate.co.us) on a monthly basis. The accounting must be submitted within <br /> 30 calendar days of the end of the month for which the accounting is being made and <br /> conform to the Administration Protocol "Augmentation Plan Accounting, Division One — <br /> South Platte River"(attached). <br /> In addition, the applicant shall verify that the City of Lafayette (WDID 0602503) includes <br /> in their monthly accounting, a report on the reusable water released to provide <br /> replacement for this SWSP. It is the Applicants responsibility to ensure Lafayette <br /> releases the leased water in the correct time, place, and amount. <br /> 11. The name, address, and phone number of a contact person who will be responsible for <br /> the operation and accounting of this plan must be provided on the accounting forms to <br /> the division engineer and water commissioner. <br /> 12. Conveyance loss for delivery of augmentation water is subject to assessment and <br /> modification as determined by the division engineer or water commissioner. <br /> 13. The approval of this substitute water supply plan does not relieve the Applicant and/or <br /> the landowner of the requirement to obtain a Water Court decree approving a permanent <br /> plan for augmentation or mitigation to ensure the permanent replacement of all <br /> depletions, including long-term evaporation losses and lagged depletions after gravel <br />