Laserfiche WebLink
Table No. 2 Applegate <br /> Middle Poudre Combined SWSP 2016 Group,Inc. <br /> 12/31/2015 <br /> 10-106 <br /> 2016 Water Balance <br /> Red Italics denote protections 2015 FHD = 185.19 ac-ft <br /> Farm Headgate Evap at <br /> Total Combined Lagged Recharge <br /> Month Lagged Delivery for Recharge Pit Net Credit of Box Return Flow Return Flow Net Impact to the <br /> Depletions Recharge of Box for Box Elder Recharge Elder Shares Factor Obligation Poudre River <br /> Elder Shares shares <br /> (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) <br /> (A) (B) (C) (D) (E) (F) (G) (H) <br /> Jan-16 6.08 0.00 0.00 0.00 16.05 1.7% 3.15 6.83 <br /> Feb-16 5.51 0.00 0.00 0.00 14.01 1.5% 2.78 5.71 <br /> Mar-16 5.27 0.00 0.00 0.00 12.52 1.3% 2.41 4.83 <br /> Apr-16 5.62 0.62 0.21 0.42 11.35 1.3% 2.41 3.32 <br /> May-16 6.55 12.76 0.25 12.51 11.62 25.1% 3.20 1.87 <br /> Jun-16 7.83 18.05 0.36 17.70 14.06 25.2% 4.55 1.68 <br /> Jul-16 8.96 29.41 0.41 29.00 17.07 22.2% 6.53 1.58 <br /> Aug-16 9.79 20.68 0.37 20.31 19.63 34.5% 7.13 2.70 <br /> Sep-16 10.01 8.04 0.27 Z77 18.14 67.1% 5.39 2.74 <br /> Oct-16 9.27 1.84 0.17 1.67 14.60 4.0% 3.66 1.68 <br /> Nov-16 8.27 0.00 0.00 0.00 11.52 2.7% 2.47 0.78 <br /> Dec-16 Z05 0.00 0.00 0.00 9.51 2.1% 1.92 0.54 <br /> Total 90.23 91.40 2.04 89.36 170.08 45.59 34.26 <br /> NOTES: <br /> (A)Total lagged depletions from Table No. 1 Column (G) <br /> (B) Projected and actual diversions into recharge in 2012 for 5 Box Elder Ditch Company shares <br /> (C) Estimated evaporation losses from the recharge site assuming 1.0 acre pond at gross evaporation rate <br /> (D) = (B) - (C) <br /> (E) Lagged recharge from recharge model <br /> (R) Return flow factors from Table No. 4 Column (F) <br /> (G) May through September: Columns(B) * (F). October through April: Column (F) *Total farm headgate delivery from previous irrigation season <br /> (H) Columns(E) - (A)- (G) (positive values indicate a net accretion) <br />