My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-03_REVISION - C1981038 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2016-02-03_REVISION - C1981038 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:02 PM
Creation date
2/3/2016 3:01:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
2/3/2016
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
TR60
Email Name
jdm
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor | Mike King, Executive Director | Virginia Brannon, Director <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br /> <br />February 3, 2016 <br /> <br /> <br />Basil Bear <br />Bowie Resources, LLC <br />P.O. Box 1488 <br />Paonia, CO 81428 <br /> <br /> <br />Re: Bowie No. 1 Mine (Permit No. C-1981-038) <br /> Proposed Decision - Technical Revision No. 60 (TR-60) <br /> 2015 Midterm Review Response <br /> <br /> <br />Dear Mr. Bear: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for <br />Technical Revision No. 60 at the Bowie No. 1 Mine. Notice of the proposed decision will be <br />published in the Delta County Independent as soon as possible. The first publication will <br />initiate the ten (10) day public comment period for the Division's decision. <br /> <br />Documentation must be submitted to the Division demonstrating that a copy of the approved <br />revision application was sent to the Office of Surface Mining and the Bureau of Land <br />Management. The material should be sent within 15 days of final approval. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the <br />amount of Bond Held equals or exceeds the Revised Liability, you need not submit additional <br />bond. However, if the Revised Liability exceeds the Bond Held, please submit additional bond <br />or rider to your existing bond that equals or exceeds the Revised Liability. This Technical <br />Revision must not be implemented until this proposed decision becomes final and until any <br />required increase in bond is submitted to and approved by the Division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.