My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-01_REPORT - C1983059
DRMS
>
Day Forward
>
Report
>
Coal
>
C1983059
>
2016-02-01_REPORT - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:01:33 AM
Creation date
2/1/2016 10:58:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Report
Doc Date
2/1/2016
From
Oxbow Mining, LLC
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
Annual Reclamation Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Reclamation, Mining <br />Annual Reclamation Report for the Year 2015 <br />Terror Creek Loadout C-1983-059 <br />mine name permit # <br />Address: P.O. Box 535, Somerset, CO 81434 <br />and Safety <br />Oxbow Mining, LLC. <br />Permittee <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br />Land Status Category <br />Last Years <br />Cumulative Total <br />This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed <br />13 <br />+ <br />0 <br />= <br />13 <br />Acres backfilled and graded <br />0 <br />0 <br />= <br />0 <br />Acres to soiled <br />0 <br />+ <br />0 <br />= <br />0 <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />each cateciory below. Do not include acres that have achieved final, Phase III release. <br />"include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 13 and the total number of acres: <br />Phase I released 0 Phase II released 0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z <br />Acreage in active mining areas 3 <br />N <br />'(exclude acres where Phase III release has been achieved) <br />13 <br />Phase III released 0 <br />N/A <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head -of -hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Last Years <br />This <br />Greater <br />Cumulative <br />Calendar <br />Cumulative <br />10 years or <br />than 10 <br />Total <br />year <br />Total ' <br />less <br />ears' <br />0 <br />0 <br />0 <br />0 <br />0 <br />Acres seeded* <br />+ <br />= <br />= <br />+ <br />"include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 13 and the total number of acres: <br />Phase I released 0 Phase II released 0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z <br />Acreage in active mining areas 3 <br />N <br />'(exclude acres where Phase III release has been achieved) <br />13 <br />Phase III released 0 <br />N/A <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head -of -hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />
The URL can be used to link to this page
Your browser does not support the video tag.