My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-29_INSPECTION - M1999034
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1999034
>
2016-01-29_INSPECTION - M1999034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:15:31 PM
Creation date
2/1/2016 10:47:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
INSPECTION
Doc Date
1/29/2016
Doc Name
Corrective Action Extension Request
From
Aggregate Industries
To
DRMS
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 28, 2016 <br />9 <br />AGGREGATE <br />INDUSTRIES <br />Mr. Tyler O'Donnell <br />Division of Reclamation Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Permit No. M-1999-034 — Cooley Reservoir and Fulton Wildlife Area <br />Status and Corrective Action Extension Request <br />Dear Tyler: <br />Mike Refer and I, Aggregate Industries' contractor and Sinclair representatives Jon <br />Brown and Tony Johnson met earlier this week to discuss flood restoration in the vicinity <br />of Sinclair's pipeline on Aggregate's land east of Cooley Reservoir. This pipeline was <br />abandoned a number of years ago when a new pipeline was installed at another location, <br />and since Sinclair has no plans at this time to put the line back in service, they have <br />removed the pipe and capped the ends. While Sinclair does not necessarily think they <br />will ever reinstall and use this pipeline, they are maintaining their easement and will <br />partner with Aggregate to get this area repaired. Jon Brown said that he would provide <br />the Division with an e-mail to that effect. <br />We would note that, while the area to be repaired around the pipeline is on land owned by <br />Aggregate, that parcel of land is not within the boundary of the Cooley Reservoir Fulton <br />Wildlife M-1999-034 permit. This work will therefore not be included in a technical <br />revision request. Aggregate will, however, proceed to coordinate with its contractor and <br />Sinclair to get the work scheduled, with the goal to have the work completed by April 1. <br />As Eduardo Moreno from City of Thornton advised by e-mail on January 15, Thornton <br />contacted FEMA for an opinion on the approach to have Aggregate perform the backfill <br />activities the Division is requiring to be completed this spring. Eduardo advised <br />yesterday that FEMA has indicated this work could proceed, apparently without <br />impacting FEMA funding for the final work to be performed by Thornton. <br />Based upon FEMA's response, Thornton and Aggregate have scheduled a meeting for <br />tomorrow afternoon to discuss a plan and schedule for reinforcing Thornton's south cell <br />Aggregate Industries <br />West Central Region, Inc. <br />1687 Cole Boulevard, Suite 300 <br />Golden, CO 80401 <br />An Equal Opportunity Employer <br />Telephone: 303-985-1070 <br />
The URL can be used to link to this page
Your browser does not support the video tag.