Laserfiche WebLink
4.0 STUDY CONCLUSIONS AND MITIGATION PLANS 12 <br />4.1. IMPACTS OF PIT DEWATERING THE THOMPSON PONDS 12 <br />4.1.1. Mitigation of Dewatering 12 <br />4.2. IMPACTS OF RECLAMATION ON BIG THOMPSON PONDS 12 <br />4.2.1. Mitigation of Reclamation 12 <br />4.3. IMPACTS ON HILLSBOROUGH DITCH 13 <br />4.4. IMPACTS ON EXISTING WELLS 13 <br />LIST OF SHEETS <br />SHEET 1 MODFLOW OUTPUT — EXISTING WATER TABLE CONTOURS <br />SHEET 2 MODFLOW OUTPUT — GROUNDWATER LEVELS - WEST PIT <br />SHEET 3 MODFLOW OUTPUT — DRAWDOWN — WEST PIT <br />SHEET 4 MODFLOW OUTPUT — GROUNDWATER LEVELS — EAST PIT <br />SHEET 5 MODFLOW OUTPUT — DRAWDOWN — EAST PIT <br />SHEET 6 MODFLOW OUTPUT — GROUNDWATER LEVELS — Reclamation <br />SHEET 7 MODFLOW OUTPUT — DRAWDOWN - Reclamation <br />APPENDICES <br />I Mitigation and monitoring agreement between Coulson Excavating and <br />Hillsboro Ditch Company <br />II Data CD containing MODFLOW input and output files and ArgusOne <br />MODFLOW GUI models <br />ii <br />