January 21, 2016 C-1981-035/King Coal Mine RAR <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />R -Air Resource Protection <br />R - Availability of Records <br />Y - Backfill & Grading <br />R - Excess Spoil and Dev. Waste <br />NA - Explosives <br />R - Fish & Wildlife <br />R - Hydrologic Balance <br />R - Gen. Compliance With Mine Plan <br />N - Other <br />Y - Processing Waste <br />17119076,4 <br />NA - Reclamation Success <br />R - Revegetation <br />N - Subsidence <br />Y - Slides and Other Damage <br />R - Support Facilities On-site <br />R - Signs and Markers <br />NA - Support Facilities Not On-site <br />NA - Special Categories Of Mining <br />R - Topsoil <br />COMMENTS <br />A complete inspection of the King Coal Mine was conducted by me, Robin Reilley, and Dan Hernandez of the DRMS <br />on Thursday, 22 January 2016. Skies were clear, and temperatures reached the low 30?F's. Snow from the days and <br />weeks before covered most of the surface facilities. Snow prevented activity at the King I refuse pile. The last <br />activity at King I occurred in mid to late November. Road hazard due to ice and snow prevented hauling from the <br />mine for the time we were present. <br />We began with an inspection of the records at GCC offices. Michael McFarland accompanied us throughout the field <br />inspection of the King I and II surface facilities. <br />The conveyer was recently pulled at 8W and moved to 9W. Development was taking place at 9W and would progress <br />to 2S by the end of January. Currently, two continuous miners are operating. <br />PERMITTING UPDATE: <br />TR -20 Coal Mine Waste for Highwall Backfill <br />o On June 9, 2015, the Division issued a supplemental adequacy item, requesting that GCC develop a sampling <br />plan for further analysis of the acid and toxic forming potential of coal mine waste. A sampling protocol was <br />submitted to DRMS. GCC submitted both an addequacy review #2 and suppplement initial response, and <br />DRMS reviewed and submitted additional adequacy questions to GCC on 2 November 2015. GCC submitted <br />responses to DRMS for adequacy review #3 on 28 December 2015. A request for extension of the decision <br />date to 31 January 2016 has been made. <br />TR -24 Midterm Review Response <br />o The Division issued an adequacy review on 14 June 2015. On 14 July the Division received a response to the <br />June 2015 letter addressing unresolved adequacy items. The Division reviewed this submittal, sent additional <br />adequacy questions to GCC on 26 October 2015. DRMS is in the process of reviewing GCC's adequacy <br />response of 30 November 2015. The decision date has been extended to 31 January 2016. <br />TR -25 Surface Water Hydrology <br />o This revision was received 6 July 2015 and found complete on 10 July 2015. DRMS fond the application <br />adequate and on 17 December 2015 issued a proposed decision. A decision was issued 30 December by <br />DRMS. <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 2 of 12 <br />