Laserfiche WebLink
Lorencito Canyon Mine (C-1996-084) <br />MT- 04 <br />the sizes of the ditches versus the design). For example, the 100 -year ditch design related to <br />Fill 7 ditches includes ditches with numbers D71, D72, etc. On the map, however, the ditches <br />have numbers such as D10, D11, and D14. In addition to this clarification, it would be very <br />helpful for NECC to include a summary table in the PAP listing the ditches and the associated <br />design parameters. <br />Section VII — Reclamation Liability and Performance Bonding <br />The Division estimates the reclamation liability for mining operations to be $842,218.36. The Division <br />currently holds a cash bond in the amount of $927,121.00 for the Lorencito Canyon Mine. No increase <br />in bond is required from the operator at this time. <br />This concludes the 2014 Midterm Review of the Lorencito Canyon Mine. Please submit any required <br />revision applications responding to the issues outlined in Section VI on or before March 31, 2016. <br />Page 10 of 10 <br />