My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-22_REPORT - M2000080
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2000080
>
2016-01-22_REPORT - M2000080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2020 9:01:45 PM
Creation date
1/27/2016 3:57:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000080
IBM Index Class Name
Report
Doc Date
1/22/2016
From
Pioneer Sand Co.
To
DRMS
Annual Report Year
2016
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> 1 Z. Total acres in various stages of reclamation,since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled_ seeded w/ �0 w/topsoil mulched w/27 <br /> approved mix: laced: / approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> traded_ *7 fertilized w/ A replacement .L� rate(tons/ac): <br /> a vd fertilizer: depth(in.): / <br /> Seed Fertilizer Mulch <br /> application fld:i application n�� application <br /> method: method method: ^` <br /> 1 W_ Is weed control being conducted in accordance with an approved Need Control Plan? YES NO NIA <br /> w <br /> If"YES",indicate the weed species,control area,control type,application rate and treatment date on the report map. <br /> 14. Is,adequate topsoil reserved for reclamation,based on your approved permit? <Y5 NO N`%A <br /> If`NO",please explain. <br /> I5. Is the resmred topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YE NO NIA <br /> I'f"NO-please explain: <br /> 16: If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of!he—,State <br /> Engineer(Well Permit,S.Wr.S.P.,and/or Permanent Augmentation Plan)? YES NO QIr <br /> 17. Are all hazardous materials stored writhin approved spill containment structures? NO N/A <br /> I& Is your financial warranty value sufficient to cover the cost to complete reclamation? �� NO N/A <br /> t9. Is hour basis for legal right to enter still valid? NO <br /> ?Q_ .Does your permit require you to submit monitoring information annually`? YES 00-' N/A <br /> If"Yes„',please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction MatenaLS(C.R.S.34-32-116 or 34-32-5-116),attach a map to this report that accurately depicts the penvit <br /> boundary,current affected area boundary and location or the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.