Laserfiche WebLink
<br />10. No additional response required. <br />11. No further discussion is needed regarding the truck tunnel. This structure was approved as <br />permanent with MR-41. Regarding the condition of the tunnel, the structure is generally in good <br />shape. Also, aerial photos indicate that the metal plate covering part of the tunnel has been in <br />place for many years. <br /> <br />Other adequacy items <br />12. It is necessary that a Minor Revision, designating stockpiles as permanent features, be <br />approved prior to approval of SL-03. This is necessary because of Rule 4.14.2, which <br />addresses grading requirements and the need for approximate pre-mining slopes. Under <br />separate cover, the Division will provide EFCI with details regarding this revision. <br /> <br />If you have questions or need additional information, please contact me. <br /> <br /> <br />Sincerely, <br /> <br /> <br /> <br /> <br />Robert D. Zuber, P.E. <br />Environmental Protection Specialist II <br /> <br />