Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />BULLDOZER WORK <br />Task description: Remove Topsoil from Knob Above Cut <br />Site: Lorencito Canvon Mine Permit Action: MT4 <br />PROJECT IDENTIFICATION <br />Task #: 034 State: Colorado <br />Date: 1/22/2016 County: Las Animas <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Page 86 of 111 <br />Permit/Job#: C1996084 <br />Abbreviation: None <br />Filename: C084-034 <br />Total unit Cost/Hour: $262.26 <br />Total Fleet Cost/Hour: $524.52 <br />MATERIAL QUANTITIES <br />Initial Volume: 5,916 <br />Swell factor: 1.250 <br />Loose volume: 7,395 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />300 feet <br />437.8 LCY/hr <br />Consolidated stockpile 1.0 <br />0% <br />7.100 feet <br />50 lbs/LCY <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$81.10 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $262.26 <br />Total Fleet Cost/Hour: $524.52 <br />MATERIAL QUANTITIES <br />Initial Volume: 5,916 <br />Swell factor: 1.250 <br />Loose volume: 7,395 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />300 feet <br />437.8 LCY/hr <br />Consolidated stockpile 1.0 <br />0% <br />7.100 feet <br />50 lbs/LCY <br />CIRCES Cost Estimating Software <br />