Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 69 of 111 <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,243.2 LCY/hr <br />production: <br />Materials consistency Consolidated stockpile 1.0 <br />description: <br />Average push 0% <br />gradient: <br />Average site 7,100 feet <br />altitude: <br />Material weight: 2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 1.000 <br />Dozing method: 1.000 <br />Visibility: 1.000 <br />Job efficiency: 0.830 <br />Spoil pile: 0.600 <br />Push gradient: 1.000 <br />Altitude: 1.000 <br />Material Weight: 0.902 <br />Blade type: 1.000 <br />Net correction: 0.3369 <br />Adjusted unit 418.83 LCY/hr <br />production: <br />Adjusted fleet 837.66 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.647/LCY <br />Total job time: 4.16 Hours <br />Total job cost: $2,258 <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />SHIFT/DAY) <br />(FND-SF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />CIRCES Cost Estimating Software <br />