Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 67 of 111 <br />Truck Maneuver and Dump 1.10 Minutes Adjusted for site altitude: 1.100 Minutes <br />Time: <br />Truck Travel (Haul &Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />penetration 5.0 <br />Haul Route: <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity Travel <br />(Ft) (%) (%) (fpm) Time <br />(min) <br />1 2400.00 4.00 5.00 9.00 977 2.516 <br />Haul Time: 2.516 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />N <br />N <br />(fpm) <br />Time <br />342.34 <br />LCY/Hour Adjusted for job efficiency: <br />284.14 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />1 <br />2400.00 <br />-4.00 <br />5.00 <br />1.00 <br />3569 <br />0.835 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 0.835 <br />Minutes <br />Total Truck Cycle Time: 6.901 <br />Minutes <br />Loading Tool unit <br />Production <br />964.29 <br />LCY/Hour Adjusted for job efficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />342.34 <br />LCY/Hour Adjusted for job efficiency: <br />284.14 LCY/Hour <br />Optimal No. of Trucks: <br />3 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 852.43 <br />LCY/Hour <br />Adjusted single truck/loader team production: 800.36 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 800.36 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 0.67 <br />Hours <br />Unit cost: <br />$1.984 <br />/LCY Total job cost: $1,071 <br />CIRCES Cost Estimating Software <br />