Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 56 of 111 <br />Truck Maneuver and Dump 1.10 Minutes Adjusted for site altitude: 1.100 Minutes <br />Time: <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />penetration 5.0 <br />Haul Route: <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity Travel <br />(Ft) (%) (%) (fpm) Time <br />mm <br />1 3600.00 3.00 5.00 8.00 1023 3.576 <br />Haul Time: 3.576 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />N <br />N <br />(fpm) <br />Time <br />283.99 <br />LCY/Hour Adjusted for job efficiency: <br />235.71 LCY/Hour <br />Optimal No. of Trucks: <br />(min) <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />1 <br />3600.00 <br />-3.00 <br />5.00 <br />2.00 <br />3569 <br />1.193 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 1.193 <br />minutes <br />Total Truck Cycle Time: 8.319 <br />minutes <br />Loading Tool unit <br />Production <br />964.29 <br />LCY/Hour Adjusted for job efficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />283.99 <br />LCY/Hour Adjusted for job efficiency: <br />235.71 LCY/Hour <br />Optimal No. of Trucks: <br />3 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 707.13 <br />LCY/Hour <br />Adjusted single truck/loader team production: 707.13 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 707.13 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 1.11 <br />Hours <br />Unit cost: <br />$2.245 <br />/LCY Total job cost: $1,768 <br />CIRCES Cost Estimating Software <br />