My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-25_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2016-01-25_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:57 PM
Creation date
1/27/2016 11:12:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
1/25/2016
Doc Name
Reclamation Cost Estimate
From
Janet Binns
To
Rob Zuber
Type & Sequence
MT4
Email Name
JHB
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd <br />Task # TTT Page 41 of 111 <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />1.000 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.600 <br />(FND-SF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.902 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3369 <br />Adjusted unit 510.17 LCY/hr <br />production: <br />Adjusted fleet 1020.34 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.532/LCY <br />Total job time: 0.23 Hours <br />Total job cost: $126 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.