My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-25_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2016-01-25_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:57 PM
Creation date
1/27/2016 11:12:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
1/25/2016
Doc Name
Reclamation Cost Estimate
From
Janet Binns
To
Rob Zuber
Type & Sequence
MT4
Email Name
JHB
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 39 of 111 <br />Truck Load Time: 1.750 Minutes Adjusted for site altitude: 1.750 Minutes <br />Truck Maneuver and Dump 1.10 Minutes Adjusted for site altitude: 1.100 Minutes <br />Time: <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />penetration 5.0 <br />Seg # <br />Haul Distance <br />Grade (%) <br />Haul Route: <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Time <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />1 <br />2700.00 <br />-4.00 <br />5.00 <br />1.00 <br />min <br />0.919 <br />LCY/Hour <br />1 <br />2700.00 <br />4.00 <br />5.00 <br />9.00 <br />977 <br />2.823 <br />Fleet size: <br />1 <br />Haul Time: <br />2.823 <br />minutes <br />Return Route: <br />/LCY Total job cost: $17,049 <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />323.99 <br />LCY/Hour Adjusted for job efficiency: <br />268.91 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />1 <br />2700.00 <br />-4.00 <br />5.00 <br />1.00 <br />3569 <br />0.919 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 0.919 <br />minutes <br />Total Truck Cycle Time: 7.292 <br />minutes <br />Loading Tool unit <br />Production <br />964.29 <br />LCY/Hour Adjusted for job efficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />323.99 <br />LCY/Hour Adjusted for job efficiency: <br />268.91 LCY/Hour <br />Optimal No. of Trucks: <br />3 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 806.72 <br />LCY/Hour <br />Adjusted single truck/loader team production: 800.36 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 800.36 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 10.74 <br />Hours <br />Unit cost: <br />$1.984 <br />/LCY Total job cost: $17,049 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.