Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Loading Tool unit <br />Production 964.29 LCY/Hour Adjusted for job efficiency: 800.36 <br />Truck Unit <br />Production 416.15 LCY/Hour Adjusted for job efficiency: 345.41 <br />Optimal No. of 2 Truck(s) Selected Number of Trucks: 2 <br />Trucks: <br />Adjusted hourly truck team production: 690.81 <br />Adjusted single truck/loader team production: 690.81 <br />Adjusted multiple truck/loader team production: 690.81 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 2.98 <br />Unit cost: $1.959 /LCY Total iob cost: $4,033 <br />Page 36 of 111 <br />LCY/Hour <br />LCY/Hour <br />Truck(s) <br />LU Y /Hour <br />LCY/Hour <br />LCY/Hour <br />Hours <br />CIRCES Cost Estimating Software <br />