Laserfiche WebLink
Truck Unit <br />Production 324.12 LCY/Hour Adjusted for job efficiency: 269.02 <br />Optimal No. of 3 Truck(s) Selected Number of Trucks: 3 <br />Trucks: <br />Adjusted hourly truck team production: 807.06 <br />Adjusted single truck/loader team production: 800.36 <br />Adjusted multiple truck/loader team production: 800.36 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 10.58 <br />Unit cost: $1.984 /LCY Total job cost: $16,803 <br />LCY/Hour <br />Truck(s) <br />LU Y /Hour <br />LCY/Hour <br />LCY/Hour <br />Hours <br />