Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Replace Topsoil from Stockpile BA#32to W-2 <br />Site: Lorencito Canyon Mine Permit Action: MT4 Permit/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Task #: 010 State: Colorado Abbreviation: None <br />Date: 1/20/2016 County: Las Animas Filename: C084-010 <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />Equipment Description <br />Truck Loader Team -Truck: Cat 773F <br />-Loader: CAT 990H high lift <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br />Total work team cost/hour: $1,587.55 <br />MATERIAL OUANTITIES <br />Initial volume: 7,530 <br />Loose volume: 8,471 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Material Purchase Cost: <br />Total Cost: <br />CCY Swell factor: 1.125 <br />LCY <br />Table 2.05.4-1f <br />Cat Handbook <br />$0.00 <br />$0.00 <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Water <br />Grader <br />Truck <br />%Utilization- <br />100 <br />100 <br />50 <br />100 <br />25 <br />25 <br />machine: <br />Ownership <br />$65.23 <br />$129.39 <br />$81.10 <br />$81.10 <br />$42.03 <br />$20.53 <br />cost/hour: <br />Operating cost/hour: <br />$124.51 <br />$166.71 <br />$71.58 <br />$143.16 <br />$17.47 <br />$11.94 <br />Ripper op. <br />NA <br />$0.00 <br />$4.45 <br />$0.00 <br />$0.00 <br />$0.00 <br />cost/hour: <br />Operator cost/hour: <br />$27.80 <br />$37.13 <br />$38.01 <br />$38.01 <br />$24.47 <br />$27.88 <br />Unit Subtotals: <br />$217.54 <br />$333.22 <br />$195.13 <br />$262.26 <br />$83.96 <br />$60.36 <br />Number of Units: <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $985.84 <br />Support: $457.39 <br />Maint: $144.32 <br />Total work team cost/hour: $1,587.55 <br />MATERIAL OUANTITIES <br />Initial volume: 7,530 <br />Loose volume: 8,471 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Material Purchase Cost: <br />Total Cost: <br />CCY Swell factor: 1.125 <br />LCY <br />Table 2.05.4-1f <br />Cat Handbook <br />$0.00 <br />$0.00 <br />