Laserfiche WebLink
Lorencito Mine Midterm No. 4 January 2015 <br />COST SUMMARY WORK <br />Task description: C-1996-081 Permit Renewal No. 3 Reclamation Cost Estimate <br />Site: Lorencito Canyon Mine <br />PROJECT IDENTIFICATION <br />Permit Action: MT4 <br />Task #: 000 State: Colorado <br />Date: 1/25/2016 County: Las Animas <br />10:27:35 AM <br />User: JHB <br />Agency or organization name <br />TASK LIST (DIRECT COSTS) <br />DRMS <br />Permit/Job#: C1996084 <br />Abbreviation: None <br />Filename: C084-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 Grade Borrow Area 3 <br />002 Replace Topsoil from Stockpile BA#1 to Fill 7a <br />003 Replace Topsoil from Stockpile SSP#2 to Fill 9a <br />004 Replace Topsoil from Stockpile SSP#3 to Fill 8 <br />005 Replace Topsoil from Stockpile SSP#2 to N-1 <br />006 Replace Topsoil from Stockpile BA#2 to C-1 <br />007 Replace Topsoil from Stockpile BA#1 to C-2 <br />008 Replace Topsoil from Stockpile BA#2 to S-2 <br />009 Replace Topsoil from Stockpile BA#3 to S-4 <br />010 Replace Topsoil from Stockpile BA#32to W-2 <br />011 Replace Topsoil from Stockpile BA#3 to W-3 <br />012 Replace Topsoil from Stockpile BA#3 to W-5 <br />013 Replace Topsoil from SA Stockpile to Service <br />Area <br />014 Replace Live -Handled Topsoil to W-1 <br />015 Replace Topsoil from Upslope to W-1 <br />016 Replace Live -Handled Topsoil to W-1 <br />017 ReplaceTopsoil from Upslope Area to W-4 <br />018 Replace Live -Handled Topsoil to W-6 <br />019 Replace Topsoil from Upslope Area to W-6 <br />020 Replace Topsoil from Stockpile BA#3 to W-6 <br />021 Replace Live -Handled Topsoil to N-2 <br />022 Replace Topsoil from Upslope Area to N-2 <br />023 Replace Live -Handled Topsoil to S-3 <br />024 Replace Topsoil from Upslope to S-3 <br />025 Replace Topsoil from Stockpile BA#3 to S-3 <br />026 Replace Topsoil from Stockpile SSP#2 to N-1 <br />027 Replace Live -Handled Topsoil to E-2 <br />028 Replace Topsoil from Upslope Area to E-2 <br />029 Replace Live -Handled Topsoil to E-3 <br />030 Replace Topsoil from Stockpile BA#3 to E-3 <br />031 Replace Topsoil from Upslope Area to BA#1 <br />032 Replace Topsoil from Upslope Area to BA#2 <br />033 Replace Topsoil from Upslope Area to BA#3 <br />034 Remove Topsoil from Knob Above Cut <br />040 Plug and Seal Drill Hole and Monitoring Wells <br />GRADER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />l <br />l <br />l <br />l <br />l <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1.72 <br />$242.00 <br />$6,584.00 <br />$9,956.00 <br />$17,708.00 <br />$11,132.00 <br />$17,376.00 <br />$10,765.00 <br />$4,053.00 <br />$5,289.00 <br />$16,803.00 <br />$4,033.00 <br />$17,049.00 <br />$126.00 <br />$2,273.00 <br />$2,266.00 <br />$904.00 <br />$1,005.00 <br />$810.00 <br />$450.00 <br />$1,768.00 <br />$6,265.00 <br />$6,733.00 <br />$515.00 <br />$277.00 <br />$1,071.00 <br />$2,258.00 <br />$434.00 <br />$432.00 <br />$866.00 <br />$2,008.00 <br />$784.00 <br />$906.00 <br />$2,036.00 <br />$13,149.00 <br />$16,000.21 <br />TRUCKI <br />4.84 <br />TRUCKI <br />7.31 <br />TRUCKI <br />13.00 <br />TRUCKI <br />8.17 <br />TRUCKI <br />12.76 <br />TRUCK1 <br />7.86 <br />TRUCKI <br />3.07 <br />TRUCK1 <br />3.33 <br />TRUCKI <br />10.58 <br />TRUCKI <br />2.98 <br />TRUCK1 <br />10.74 <br />DOZER <br />0.23 <br />DOZER <br />4.33 <br />DOZER <br />4.32 <br />DOZER <br />1.72 <br />DOZER <br />1.92 <br />DOZER <br />1.54 <br />DOZER <br />0.86 <br />TRUCKI <br />1.11 <br />DOZER <br />11.55 <br />DOZER <br />12.84 <br />DOZER <br />0.98 <br />DOZER <br />0.53 <br />TRUCKI <br />0.67 <br />DOZER <br />4.16 <br />DOZER <br />0.83 <br />DOZER <br />0.82 <br />DOZER <br />1.65 <br />TRUCKI <br />1.27 <br />DOZER <br />1.45 <br />DOZER <br />1.73 <br />DOZER <br />3.88 <br />DOZER <br />25.07 <br />BOREHOLE <br />27.00 <br />