Laserfiche WebLink
Haul Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />mm <br />1 <br />8100.00 <br />0.00 <br />5.00 <br />5.00 <br />1741 <br />4.837 <br />Haul Time: 4.837 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />214.09 <br />LCY/Hour Adjusted for job efficiency: <br />177.70 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />1 <br />8100.00 <br />0.00 <br />5.00 <br />5.00 <br />3405 <br />2.648 <br />LCY/Hour <br />Return Time: 2.648 <br />minutes <br />Total Truck Cycle Time: 11.035 <br />minutes <br />Loading Tool unit <br />Production <br />964.29 <br />LCY/Hour Adjusted for job efficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />214.09 <br />LCY/Hour Adjusted for job efficiency: <br />177.70 LCY/Hour <br />Optimal No. of Trucks: <br />5 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 355.39 <br />LCY/Hour <br />Adjusted single truck/loader team production: 355.39 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 355.39 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 3.07 <br />Hours <br />Unit cost: <br />$3.714 <br />/LCY Total job cost: $4,053 <br />