Laserfiche WebLink
Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />(%) <br />(fpm) <br />Time <br />rmn <br />1 <br />1000.00 <br />-8.00 <br />5.00 <br />-3.00 <br />3512 <br />0.343 <br />Haul Time: 0.343 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />505.78 <br />LCY/Hour Adjusted for job efficiency: <br />419.80 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />1 <br />1000.00 <br />8.00 <br />5.00 <br />13.00 <br />1362 <br />0.778 <br />LCY/Hour <br />Return Time: 0.778 <br />minutes <br />Total Truck Cycle Time: 4.671 <br />minutes <br />Loading Tool unit <br />Production <br />964.29 <br />LCY/Hour Adjusted for job efficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />505.78 <br />LCY/Hour Adjusted for job efficiency: <br />419.80 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 839.60 <br />LCY/Hour <br />Adjusted single truck/loader team production: 800.36 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 800.36 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 7.86 <br />Hours <br />Unit cost: <br />$1.712 <br />/LCY Total job cost: $10,765 <br />