TRUCK/LOADER TEAM WORK <br />Task description: Replace Topsoil from Stockpile BA#1 to C-2 <br />Site: Lorencito Canyon Mine Permit Action: MT4 Permit/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Task #: 007 State: Colorado Abbreviation: None <br />Date: 1/20/2016 County: Las Animas Filename: C084-007 <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />Truck Loader Team -Truck: Cat 773F <br />-Loader: CAT 990H high lift <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Cost Breakdown: Truck/Loader Team Sunnort Fouinment Maintenance Fouinment <br />Total work team cost/hour: $1,370.01 <br />MATERIAL OUANTITIES <br />Initial volume: 5,590 CCY Swell factor: 1.125 <br />Loose volume: 6,289 LCY <br />Source of estimated volume: Table 2.05.4-1f <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />50 <br />100 <br />25 <br />25 <br />Ownership cost/hour: <br />$65.23 <br />$129.39 <br />$81.10 <br />$81.10 <br />$42.03 <br />$20.53 <br />Operating cost/hour: <br />$124.51 <br />$166.71 <br />$71.58 <br />$143.16 <br />$17.47 <br />$11.94 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$4.45 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$27.80 <br />$37.13 <br />$38.01 <br />$38.01 <br />$24.47 <br />$27.88 <br />Unit Subtotals: <br />$217.54 <br />$333.22 <br />$195.13 <br />$262.26 <br />$83.96 <br />$60.36 <br />Number of Units: <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$768.30 <br />Support: <br />$457.39 <br />Maint: <br />$144.32 <br />Total work team cost/hour: $1,370.01 <br />MATERIAL OUANTITIES <br />Initial volume: 5,590 CCY Swell factor: 1.125 <br />Loose volume: 6,289 LCY <br />Source of estimated volume: Table 2.05.4-1f <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weigho Basis: <br />Material weight: <br />2,550 Pounds/LCY <br />Description: <br />Earth - Dry packed <br />Rated Payload: <br />122,520 Pounds <br />Payload Capacity: <br />48.05 LCY <br />Truck Bed (volume) Basis: <br />