Laserfiche WebLink
Operation: Constant operation -0.04 -0.040 (Cat HB) <br />Dump Target: Nominal target 0.00 0.000 (Cat HB) <br />Net Cycle Time Adjustment: -0.050 minutes <br />Adjusted Loader Cycle Time: 0.550 minutes <br />Net Load Time per Truck: 1.750 minutes <br />Truck Cvcle Time: <br />Truck Exchange Time: <br />0.70 <br />Minutes Adjusted for site altitude: 0.700 <br />Truck Load Time: <br />1.750 <br />Minutes Adjusted for site altitude: 1.750 <br />Truck Maneuver and Dump <br />1.10 <br />Minutes Adjusted for site altitude: 1.100 <br />Time: <br />(%) <br />Res (%) <br />Truck Travel (Haul & Return) <br />Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" <br />tire penetration 5.0 <br />LCY/Hour Adjusted for job efficiency: <br />348.17 LCY/Hour <br />Haul Route: <br />600.00 <br />-17.00 <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total <br />Velocity <br />Travel <br />(Ft) <br />(Ft) <br />(%) <br />(%) <br />Res (%) <br />(fpm) <br />Time <br />Production 419.48 <br />LCY/Hour Adjusted for job efficiency: <br />348.17 LCY/Hour <br />1 <br />600.00 <br />-17.00 <br />1 <br />600.00 <br />17.00 <br />5.00 <br />22.00 <br />359 <br />1.676 <br />Haul Time: 1.676 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />(%) <br />Res (%) (fpm) <br />Time <br />Truck Unit <br />Production 419.48 <br />LCY/Hour Adjusted for job efficiency: <br />348.17 LCY/Hour <br />1 <br />600.00 <br />-17.00 <br />5.00 <br />-12.00 1920 <br />0.406 <br />Minutes <br />Minutes <br />Minutes <br />Adjusted hourly truck team production: 696.33 LCY/HOur <br />Adjusted single truck/loader team production: 696.33 LCY/Hour <br />Adjusted multiple truck/loader team production: 696.33 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 8.17 Hours <br />Unit cost: $1.955 /LCY Total job cost: $11,132 <br />Return Time: 0.406 <br />minutes <br />Total Truck Cycle Time: 5.632 <br />minutes <br />Loading Tool unit <br />Production 964.29 <br />LCY/Hour Adjusted for job efficiency: <br />800.36 LCY/Hour <br />Truck Unit <br />Production 419.48 <br />LCY/Hour Adjusted for job efficiency: <br />348.17 LCY/Hour <br />Optimal No. of 2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Trucks: <br />Adjusted hourly truck team production: 696.33 LCY/HOur <br />Adjusted single truck/loader team production: 696.33 LCY/Hour <br />Adjusted multiple truck/loader team production: 696.33 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 8.17 Hours <br />Unit cost: $1.955 /LCY Total job cost: $11,132 <br />