Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 107 of 111 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ <br />unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Fuel Tanker, 6x4, 210 HP <br />$43.74 <br />1 <br />$43.74 <br />$43.74 <br />Lube Truck, 6x4, 210 HP <br />$57.46 <br />1 <br />$57.46 <br />$57.46 <br />Flatbed Truck, 6x4, 45K GVW <br />$55.22 <br />1 <br />$55.22 <br />$55.22 <br />Light Duty Pickup, 4x4, 1 T. <br />Crew <br />$25.49 <br />1 <br />$25.49 <br />$25.49 <br />Subtotals: $181.91 $181.91 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Non- <br />Roadable <br />Equipme� <br />Haul Time (Hours): 0.57 <br />Return Time (Hours): 0.57 <br />Loading Time (Hours): 0.50 <br />Unloading Time (Hours): 0.50 <br />Subtotals: 2.14 <br />JOB TIME AND COST <br />Roadable <br />Eauinment <br />0.57 <br />0.57 <br />NA <br />NA <br />1.14 <br />TRINIDAD <br />20.00 miles <br />35.00 mph <br />$18,860.56 <br />$207.90 <br />Total job time: 4.29 Hours <br />Total job cost: $19,068 <br />CIRCES Cost Estimating Software <br />