Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 104 of 111 <br />Truck Maneuver and Dump 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br />Time: <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />Time <br />225.96 LCY/Hour <br />Truck Unit Production <br />(min) <br />1 <br />5000.00 <br />5.00 <br />5.00 <br />10.00 <br />1068 <br />4.695 <br />Haul Time: 4.695 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res Velocity <br />Travel <br />minutes <br />Loading Tool unit <br />(Ft) <br />N <br />N (fpm) <br />Time <br />225.96 LCY/Hour <br />Truck Unit Production <br />71.64 <br />min <br />59.46 LCY/Hour <br />Optimal No. of Trucks: <br />1 <br />5000.00 <br />-5.00 <br />5.00 <br />0.00 2938 <br />1.727 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 1.727 <br />minutes <br />Total Truck Cycle Time: 9.937 <br />minutes <br />Loading Tool unit <br />Production <br />272.24 <br />LCY/Hour Adjusted for job efficiency: <br />225.96 LCY/Hour <br />Truck Unit Production <br />71.64 <br />LCY/Hour Adjusted for job efficiency: <br />59.46 LCY/Hour <br />Optimal No. of Trucks: <br />4 <br />Truck(s) Selected Number of Trucks: <br />4 Truck(s) <br />Adjusted hourly truck team production: 237.85 <br />LCY/Hour <br />Adjusted single truck/loader team production: 225.96 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 225.96 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 122.42 <br />Hours <br />Unit cost: <br />$2.820 <br />/LCY Total job cost: $78,014 <br />CIRCES Cost Estimating Software <br />