My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-25_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2016-01-25_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:57 PM
Creation date
1/27/2016 11:12:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
1/25/2016
Doc Name
Reclamation Cost Estimate
From
Janet Binns
To
Rob Zuber
Type & Sequence
MT4
Email Name
JHB
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 102 of 111 <br />TRUCK/LOADER TEAM WORK <br />Task description: Clean Sediment Ponds at Mine Site <br />Site: Lorencito Canvon Mine Permit Action: MT4 <br />PROJECT IDENTIFICATION <br />Task #: 060 State: Colorado <br />Date: 1/21/2016 County: Las Animas <br />User: JHB <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Equipment Description <br />Truck Loader Team -Truck: Generic 10-12 cy, 6x4 <br />-Loader: Cat 324E L 9'-8" Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: Cat D8T - 8SU <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Permit/Job#: C1996084 <br />Abbreviation: None <br />Filename: C084-060 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Eauimnent Maintenance Eauinment <br />Total work team cost/hour: $637.29 <br />MATERIAL QUANTITIES <br />Initial volume: 21,780 CCY Swell factor: 1.270 <br />Loose volume: 27,661 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,700 Pounds/LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$12.65 <br />$32.59 <br />NA <br />$62.67 <br />NA <br />NA <br />Operating cost/hour: <br />$63.40 <br />$63.43 <br />NA <br />$108.22 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$28.17 <br />NA <br />$38.01 <br />NA <br />NA <br />Unit Subtotals: <br />$76.05 <br />$124.19 <br />NA <br />$208.90 <br />NA <br />NA <br />Number of Units: <br />4 <br />1 <br />0 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$428.39 <br />Support: <br />$208.90 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $637.29 <br />MATERIAL QUANTITIES <br />Initial volume: 21,780 CCY Swell factor: 1.270 <br />Loose volume: 27,661 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,700 Pounds/LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.