My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-25_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2016-01-25_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:57 PM
Creation date
1/27/2016 11:12:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
1/25/2016
Doc Name
Reclamation Cost Estimate
From
Janet Binns
To
Rob Zuber
Type & Sequence
MT4
Email Name
JHB
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br />Task description: Replace Topsoil from Stockpile SSP#2 to Fill 9a <br />Site: Lorencito Canyon Mine Permit Action: MT4 Permit/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado Abbreviation: None <br />Date: 1/20/2016 County: Las Animas Filename: C084-003 <br />User: JHB <br />Agency or organization name: DRMS <br />M: DII];7 Wd x[111] 19u I �1►111[K17C11 Y <br />Equipment Description <br />Truck Loader Team -Truck: Cat 773F <br />-Loader: CAT 990H high lift <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br />Total work team cost/hour: $1,361.68 <br />MATERIAL QUANTITIES <br />Initial volume: 4,950 CCY Swell factor: 1.125 <br />Loose volume: 5,569 LCY <br />Source of estimated volume: Table 2.05.4-1f <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Water <br />Grader <br />Truck <br />%Utilization- <br />machine: <br />100 <br />95 <br />50 <br />100 <br />25 <br />25 <br />Ownership <br />$65.23 <br />$129.39 <br />$81.10 <br />$81.10 <br />$42.03 <br />$20.53 <br />cost/hour: <br />Operating cost/hour: <br />$124.51 <br />$158.37 <br />$71.58 <br />$143.16 <br />$17.47 <br />$1194 <br />Ripper op. <br />NA <br />$0.00 <br />$4.45 <br />$0.00 <br />$0.00 <br />$0.00 <br />cost/hour: <br />Operator cost/hour: <br />$27.80 <br />$37.13 <br />$38.01 <br />$38.01 <br />$24.47 <br />$27.88 <br />Unit Subtotals: <br />$217.54 <br />$324.89 <br />$195.13 <br />$262.26 <br />$83.96 <br />$60.36 <br />Number of Units: <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $759.97 <br />Support: $457.39 <br />Maint: $144.32 <br />Total work team cost/hour: $1,361.68 <br />MATERIAL QUANTITIES <br />Initial volume: 4,950 CCY Swell factor: 1.125 <br />Loose volume: 5,569 LCY <br />Source of estimated volume: Table 2.05.4-1f <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.