New Horizon Mine <br />III. Summary of Reclamation and Management <br />The Section 6 areas requested for Phase I bond release had contained an overburden storage pile, <br />topsoil piles, and a haul road. The overburden pile, topsoil piles, and haul road were removed <br />and topsoil was replaced in 2015. The reclamation work completed included removing the <br />overburden storage pile and the haul road fill, regrading to the surface to the approved post - <br />mining topography, and topsoil replacement as shown on Maps 1 and 2. <br />The Section 31 area was the BB Road Detour and a topsoil stockpile site and was reclaimed in <br />2004 and 2010 respectively. The BB Road Detour area was regarded, topsoil was spread on the <br />regraded area, and the reclaimed area was seeded. The topsoil was removed from the stockpile <br />and spread on reclaimed ground, and the stockpile site was seeded as shown on Maps 1 and 3. <br />The reclaimed areas have been regraded consistent with the approved post -mining topography <br />(please see Map 2.05.4-1-3), and follows all criteria set forth for Phase I bond release by the <br />Colorado Division of Reclamation Mining and Safety. Please refer to Maps 2 and 3 for <br />representative cross-sections of the regraded areas in relation to the approved post -mining <br />topography. <br />There is not any applicable drainage control constructed within this Phase I application. The <br />post -mine land use is dryland pasture and irrigated pasture. Sediment control is provided by <br />Pond 007 as shown on Map 2.05.3(3)-1-2 for the Phase I areas in Section 6. Sediment control <br />was provided by Ponds 007, 009, and 014 for the Phase I areas in Section 31. <br />SL -18 Phase I Bond Release Application Page 6 <br />