Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 65 of 111 <br />TRUCK/LOADER TEAM WORK <br />Task description: Replace Topsoil from Stockpile BA#3 to S-3 <br />Site: Lorencito Canyon Mine Permit Action: MT4 Permit/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Task #: 025 State: Colorado <br />Date: 1/20/2016 County: Las Animas <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: I Cat 773F <br />-Loader: I CAT 990H high lift <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance -Motor Grader: <br />-Water Truck: <br />f act Rreakdnwn- Tnick/T.narler Team <br />Abbreviation: None <br />Filename: C084-025 <br />Shift basis: 1 ner day <br />Cat D9T - 9SU <br />Cat D9T - 9SU <br />CAT 14M <br />Water Tanker, 5,000 Gal. <br />Snnnnrt F.nninment <br />Maintenance Fouinment <br />Truck <br />Loader <br />Load Area <br />Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization -machine: 100 <br />100 <br />50 <br />100 25 <br />25 <br />Ownership cost/hour: $65.23 <br />$129.39 <br />$81.10 <br />$81.10 $42.03 <br />$20.53 <br />Operating cost/hour: $124.51 <br />$166.71 <br />$71.58 <br />$143.16 $17.47 <br />$11.94 <br />Ripper op. cost/hour: NA <br />$0.00 <br />$4.45 <br />$0.00 $0.00 <br />$0.00 <br />Operator cost/hour: $27.80 <br />$37.13 <br />$38.01 <br />$38.01 $24.47 <br />$27.88 <br />Unit Subtotals: $217.54 <br />$333.22 <br />$195.13 <br />$262.26 $83.96 <br />$60.36 <br />Number of Units: 3 <br />1 <br />1 <br />1 1 <br />1 <br />Group Subtotals: Work: $985.84 <br />Support: $457.39 Maint: $144.32 <br />Total work team cost/hour: $1,587.55 <br />MATERIAL OUANTITIES <br />Initial volume: 480 CCY Swell factor: 1.125 <br />Loose volume: 540 LCY <br />Source of estimated volume: Table 2.05.4-1 f <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material weight: 2,550 Pounds/LCY <br />Description: Earth - Dry packed <br />Rated Payload: 122,520 Pounds <br />CIRCES Cost Estimating Software <br />