Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 55 of 111 <br />Payload Capacity: 48.05 <br />Truck Bed (volume) Basis: <br />LCY <br />Struck Volume: <br />35.00 LCY <br />Heaped Volume: <br />46.50 LCY <br />Average Volume: <br />40.75 LCY <br />Adjusted Volume: <br />46.50 LCY <br />Final Truck Volume Based on Number of Loader Passes: 39.38 <br />Loading Tool Capacity <br />0.010 <br />(Cat HB) <br />Bucket Size Class: NA <br />Rated Capacity: <br />11.250 LCY (heaped) <br />Bucket Fill Factor: <br />0.875 Loose material - 1" and over 85 - 90% 0.875 <br />Adjusted Capacity: <br />9.844 LCY <br />Job Condition Corrections: <br />Site Altitude (ft.): 7100 feet <br />0.04 <br />Truck Loader Source <br />Altitude Ad': <br />1.000 1.000 CAT HB <br />-0.040 <br />Job Efficiency: <br />0.830 0.830 (CAT HB <br />Nominal target 0.00 <br />Net Correction: <br />0.830 0.830 <br />LoadinE Tool Cycle Time: <br />Number of Loading Tool Passes Required to Fill <br />Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA <br />Maneuver: NA Dump: 0.100 <br />LCY <br />4 passes <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, 0.600 mutes <br />maneuver): <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Mixed material 0.02 <br />0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft, high or less <br />0.010 <br />(Cat HB) <br />0.01 <br />Truck Ownership: <br />Common ownership of trucks and loaders - <br />-0.040 <br />(Cat HB) <br />0.04 <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />Cat HB <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Cat HB <br />Truck Cycle Time: <br />Truck Exchange Time <br />Truck Load Time <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />-0.050 minutes <br />0.550 minutes <br />1.750 minutes <br />0.70 Minutes Adjusted for site altitude: 0.700 Minutes <br />1.750 Minutes Adjusted for site altitude: 1.750 Minutes <br />CIRCES Cost Estimating Software <br />