Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 40 of 111 <br />BULLDOZER WORK <br />Task description: Replace Topsoil from SA Stockpile to Service Area <br />Site: Lorencito Canyon Mine Permit Action: MT4 Permit/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Task #: 013 <br />Date: 1/21/2016 <br />User: JHB <br />State: Colorado <br />County: Las Animas <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: C084-013 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi -Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$81.10 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost/Hour: <br />$8.91 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $271.17 <br />Total Fleet Cost/Hour: <br />$542.33 <br />MATERIAL QUANTITIES <br />Initial Volume: 210 <br />Swell factor: 1.125 <br />Loose volume: 236 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude <br />Material weight: <br />0% <br />Table 2.05.4-1f <br />Cat Handbook <br />75 feet <br />1,514.3 LCY/hr <br />Consolidated stockpile 1.0 <br />7,100 feet <br />lbs/LCY <br />CIRCES Cost Estimating Software <br />