My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-26_REVISION - C1996084 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2016-01-26_REVISION - C1996084 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:15:16 PM
Creation date
1/26/2016 12:27:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
1/26/2016
Doc Name
Midterm Permit Review & Cost Estimate
From
DRMS
To
New Elk CoalCompany, LLC
Type & Sequence
MT4
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT <br />TRUCK/LOADER TEAM WORK <br />Page 37 of 111 <br />Task description: Replace Topsoil from Stockpile BAO to W-5 <br />Site: Lorencito Canyon Mine Permit Action: MT4 Permit/Job#: C1996084 <br />PROJECT IDENTIFICATION <br />Task #: 012 State: Colorado Abbreviation: None <br />Date: 1/20/2016 County: Las Animas Filename: C084-012 <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST Shift basis: 1 ner day <br />Equipment Descrition <br />Truck Loader Team -Truck: <br />-Loader: <br />Cat 773F <br />CAT 990H high lift <br />Support Equipment -Load Area: <br />-Dump Area: <br />Cat D9T - 9SU <br />Cat D9T - 9SU <br />Road Maintenance -Motor Grader: <br />-Water Truck: <br />CAT 14M <br />Water Tanker, 5,000 Gal. <br />Cnet Rreakdnwn- Trnek/T.narier Team Snnnnrt FAninment Maintenance F,auinment <br />Total work team cost/hour: $1,587.55 <br />MATERIAL OUANTITIES <br />Initial volume: 7,640 CCY <br />Loose volume: 8,595 LCY <br />Source of estimated volume: Table 2.05.4-1f <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.125 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material weight: 2,550 Pounds/LCY <br />Description: Earth - Dry packed <br />Rated Payload: 122,520 Pounds <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />50 <br />100 <br />25 <br />25 <br />Ownership cost/hour: <br />$65.23 <br />$129.39 <br />$81.10 <br />$81.10 <br />$42.03 <br />$20.53 <br />Operating cost/hour: <br />$124.51 <br />$166.71 <br />$71.58 <br />$143.16 <br />$17.47 <br />$11.94 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$4.45 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$27.80 <br />1 $37.13 <br />$38.01 <br />$38.01 <br />$24.47 <br />$27.88 <br />Unit Subtotals: <br />$217.54 <br />$333.22 <br />$195.13 <br />$262.26 <br />$83.96 <br />$60.36 <br />Number of Units: <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$985.84 <br />Support: <br />$457.39 <br />Maint: <br />$144.32 <br />Total work team cost/hour: $1,587.55 <br />MATERIAL OUANTITIES <br />Initial volume: 7,640 CCY <br />Loose volume: 8,595 LCY <br />Source of estimated volume: Table 2.05.4-1f <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.125 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material weight: 2,550 Pounds/LCY <br />Description: Earth - Dry packed <br />Rated Payload: 122,520 Pounds <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.