My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-26_REVISION - C1996084 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2016-01-26_REVISION - C1996084 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:15:16 PM
Creation date
1/26/2016 12:27:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
1/26/2016
Doc Name
Midterm Permit Review & Cost Estimate
From
DRMS
To
New Elk CoalCompany, LLC
Type & Sequence
MT4
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res Total Res <br />Velocity <br />Travel <br />Travel <br />(Ft) <br />(%) (%) <br />(fpm) <br />Time <br />(%) <br />(%) (fpm) <br />Time <br />328.81 LCY/Hour Adjusted for job efficiency: <br />min <br />1 <br />2200.00 <br />5.00 <br />5.00 10.00 <br />773 <br />2.874 <br />Haul Time: 2.874 minutes <br />Return Route: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.984 /LCY <br />Total job time: 3.33 Hours <br />Total job cost: $5,289 <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res Velocity <br />Travel <br />Production <br />(Ft) <br />800.36 LCY/Hour <br />(%) <br />(%) (fpm) <br />Time <br />328.81 LCY/Hour Adjusted for job efficiency: <br />272.91 LCY/Hour <br />Optimal No. of Trucks: <br />3 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />min <br />LCY/Hour <br />1 <br />2200.00 <br />-5.00 <br />5.00 <br />0.00 3569 <br />0.761 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.984 /LCY <br />Total job time: 3.33 Hours <br />Total job cost: $5,289 <br />Return Time: 0.761 <br />minutes <br />Total Truck Cycle Time: 7.185 <br />minutes <br />Loading Tool unit <br />Production <br />964.29 LCY/Hour Adjusted for job efficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />328.81 LCY/Hour Adjusted for job efficiency: <br />272.91 LCY/Hour <br />Optimal No. of Trucks: <br />3 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 818.74 <br />LCY/Hour <br />Adjusted single truck/loader team production: 800.36 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 800.36 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.984 /LCY <br />Total job time: 3.33 Hours <br />Total job cost: $5,289 <br />
The URL can be used to link to this page
Your browser does not support the video tag.