Laserfiche WebLink
Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res Total Res <br />Velocity <br />Travel <br />Travel <br />(Ft) <br />(%) (%) <br />(fpm) <br />Time <br />(%) <br />(%) (fpm) <br />Time <br />328.81 LCY/Hour Adjusted for job efficiency: <br />min <br />1 <br />2200.00 <br />5.00 <br />5.00 10.00 <br />773 <br />2.874 <br />Haul Time: 2.874 minutes <br />Return Route: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.984 /LCY <br />Total job time: 3.33 Hours <br />Total job cost: $5,289 <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res Velocity <br />Travel <br />Production <br />(Ft) <br />800.36 LCY/Hour <br />(%) <br />(%) (fpm) <br />Time <br />328.81 LCY/Hour Adjusted for job efficiency: <br />272.91 LCY/Hour <br />Optimal No. of Trucks: <br />3 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />min <br />LCY/Hour <br />1 <br />2200.00 <br />-5.00 <br />5.00 <br />0.00 3569 <br />0.761 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.984 /LCY <br />Total job time: 3.33 Hours <br />Total job cost: $5,289 <br />Return Time: 0.761 <br />minutes <br />Total Truck Cycle Time: 7.185 <br />minutes <br />Loading Tool unit <br />Production <br />964.29 LCY/Hour Adjusted for job efficiency: <br />800.36 LCY/Hour <br />Truck Unit Production <br />328.81 LCY/Hour Adjusted for job efficiency: <br />272.91 LCY/Hour <br />Optimal No. of Trucks: <br />3 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 818.74 <br />LCY/Hour <br />Adjusted single truck/loader team production: 800.36 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 800.36 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.984 /LCY <br />Total job time: 3.33 Hours <br />Total job cost: $5,289 <br />