Laserfiche WebLink
Truck Ownership: <br />Common ownership of trucks and loaders <br />-0.040 <br />(Cat HB) <br />Velocity <br />-0.04 <br />Res (%) <br />TTrave <br />ime <br />(fpm) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Net Cycle Time Adjustment: <br />-0.050 <br />minutes <br />Adjusted Loader Cycle Time: <br />0.550 <br />minutes <br />Net Load Time per Truck: <br />1.750 <br />minutes <br />Truck Cvcle Time: <br />Truck Exchange Time: 0.70 Minutes Adjusted for site altitude: 0.700 <br />Truck Load Time: 1.750 Minutes Adjusted for site altitude: 1.750 <br />Truck Maneuver and Dump 1.10 Minutes Adjusted for site altitude: 1.100 <br />Time: <br />Truck Travel (Haul & Return)Time: Road Condition: Rutted dirt, little maintenance, no water, 2" <br />tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance Grade (%) Roll. Res <br />Total <br />Velocity <br />Velocity <br />(Ft) (%) <br />Res (%) <br />TTrave <br />ime <br />(fpm) <br />(%) <br />Res (%) <br />(fpm) <br />nun <br />1 <br />1200.00 -8.00 5.00 <br />-3.00 <br />3512 0.402 <br />Haul Time: 0.402 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade (%) Roll. Res <br />Total <br />Velocity <br />el <br />Loading Tool unit <br />(Ft) <br />(%) <br />Res (%) <br />(fpm) <br />Time <br />Truck Unit <br />Production <br />484.42 LCY/Hour Adjusted for job efficiency: <br />rain <br />1 <br />1200.00 <br />8.00 5.00 <br />13.00 <br />1362 <br />0.925 <br />Minutes <br />Minutes <br />Minutes <br />Adjusted hourly truck team production: 804.13 LCY/Hour <br />Adjusted single track/loader team production: 800.36 LCY/Hour <br />Adjusted multiple truck/loader team production: 800.36 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 4.84 Hours <br />Unit cost: $1.701 /LCY Total job cost: $6,584 <br />Return Time: 0.925 <br />minutes <br />Total Truck Cycle Time: 4.877 <br />minutes <br />Loading Tool unit <br />Production <br />964.29 LCY/Hour Adjusted for job efficiency: <br />800.36 LCY/Hour <br />Truck Unit <br />Production <br />484.42 LCY/Hour Adjusted for job efficiency: <br />402.07 LCY/Hour <br />Optimal No. of <br />2 Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Trucks: <br />Adjusted hourly truck team production: 804.13 LCY/Hour <br />Adjusted single track/loader team production: 800.36 LCY/Hour <br />Adjusted multiple truck/loader team production: 800.36 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 4.84 Hours <br />Unit cost: $1.701 /LCY Total job cost: $6,584 <br />