My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-26_REVISION - C1996084 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2016-01-26_REVISION - C1996084 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:15:16 PM
Creation date
1/26/2016 12:27:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
1/26/2016
Doc Name
Midterm Permit Review & Cost Estimate
From
DRMS
To
New Elk CoalCompany, LLC
Type & Sequence
MT4
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lorencito Mine Midterm No. 4 January 2015 <br />COST SUMMARY WORK <br />Task description: C-1996-081 Permit Renewal No. 3 Reclamation Cost Estimate <br />Site: Lorencito Canyon Mine Permit Action: MT4 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 1/25/2016 County: Las Animas <br />10:27:35 AM <br />User: JHB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1996084 <br />Abbreviation: None <br />Filename: C084-000 <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />009 <br />010 <br />011 <br />012 <br />013 <br />014 <br />015 <br />016 <br />017 <br />018 <br />019 <br />020 <br />021 <br />022 <br />023 <br />024 <br />025 <br />026 <br />027 <br />028 <br />029 <br />030 <br />031 <br />032 <br />033 <br />034 <br />040 <br />Grade Borrow Area 3 GRADER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1.72 <br />$242.00 <br />$6,584.00 <br />$9,956.00 <br />$17,708.00 <br />$11,132.00 <br />$17,376.00 <br />$10,765.00 <br />$4,053.00 <br />$5,289.00 <br />$16,803.00 <br />$4,033.00 <br />$17,049.00 <br />$126.00 <br />$2,273.00 <br />$2,266.00 <br />$904.00 <br />$1,005.00 <br />$810.00 <br />$450.00 <br />$1,768.00 <br />$6,265.00 <br />$6,733.00 <br />$515.00 <br />$277.00 <br />$1,071.00 <br />$2,258.00 <br />$434.00 <br />$432.00 <br />$866.00 <br />$2,008.00 <br />$784.00 <br />$906.00 <br />$2,036.00 <br />$13,149.00 <br />$16,000.21 <br />Re lace Topsoil from Stockpile BA#1 to Fill 7a TRUCKI <br />4.84 <br />Replace Topsoil from Stockpile SSP#2 to Fill 9a TRUCKI <br />7.31 <br />Replace Topsoil from Stockpile SSP#3 to Fill 8 TRUCKI <br />13.00 <br />Replace Topsoil from Stockpile SSP#2 to N-1 TRUCKI <br />8.17 <br />Replace Topsoil from Stockpile BA#2 to C-1 TRUCKI <br />12.76 <br />Replace Topsoil from Stockpile BA#1 to C-2 TRUCKI <br />7.86 <br />Replace Topsoil from Stockpile BA#2 to S-2 TRUCKI <br />3.07 <br />Replace Topsoil from Stockpile BA#3 to S-4 TRUCKI <br />3.33 <br />Replace Topsoil from Stockpile BA#32to W-2 TRUCKI <br />10.58 <br />Replace Topsoil from Stockpile BA#3 to W-3 TRUCKI <br />2.98 <br />Replace Topsoil from Stockpile BA#3 to W-5 TRUCKI <br />10.74 <br />Replace Topsoil from SA Stockpile to Service DOZER <br />Area <br />0.23 <br />Replace Live -Handled Topsoil to W-1 DOZER <br />4.33 <br />Replace Topsoil from U slo e to W-1 DOZER <br />4.32 <br />Replace Live -Handled Topsoil to W-1 DOZER <br />1.72 <br />Re laceTo soil from U slo e Area to W-4 DOZER <br />1.92 <br />Replace Live -Handled Topsoil to W-6 DOZER <br />1.54 <br />Replace Topsoil from U slo e Area to W-6 DOZER <br />0.86 <br />Replace Topsoil from Stockpile BA#3 to W-6 TRUCKI <br />1.11 <br />Replace Live -Handled Topsoil to N-2 DOZER <br />11.55 <br />Replace Topsoil from U slo e Area to N-2 DOZER <br />12.84 <br />Replace Live -Handled Topsoil to S-3 DOZER <br />0.98 <br />Replace Topsoil from U slo e to S-3 DOZER <br />0.53 <br />Replace Topsoil from Stockpile BA#3 to S-3 TRUCKI <br />0.67 <br />Replace Topsoil from Stockpile SSP#2 to N-1 DOZER <br />4.16 <br />Replace Live -Handled Topsoil to E-2 DOZER <br />0.83 <br />Replace Topsoil from U slo e Area to E-2 DOZER <br />0.82 <br />Replace Live -Handled Topsoil to E-3 DOZER <br />1.65 <br />Replace Topsoil from Stockpile BA#3 to E-3 TRUCKI <br />1.27 <br />Replace Topsoil from U slo e Area to BA#1 DOZER <br />1.45 <br />Replace Topsoil from U slo e Area to BA#2 DOZER <br />1.73 <br />Replace Topsoil from U slo e Area to BA#3 DOZER <br />3.88 <br />Remove Topsoil from Knob Above Cut DOZER <br />25.07 <br />Plu and Seal Drill Hole and Monitoring Wells BOREHOLE <br />27.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.