Laserfiche WebLink
Keenesburg Strip Mine; <br />C-1981-028; SL -08 Bond Release) <br />PROJECT IDENTIFICATION <br />Date: 20 -Jan -16 <br />User: JLE <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: SL8 Bond Release <br />Direct Cost Summary <br />Task Task Description <br />Permit C-1981-028 Site: Keenesburg Strip Mine <br />State: Colorado <br />County: Weld <br />Task Hours Direct Cost <br />A Backfilling and Grading <br />330.8 <br />$610,991.00 <br />B Highwall Reduction; Blasting Cost <br />0 <br />$0.00 <br />C Rip and Regrade Haul and Access Roads <br />9.39 <br />$2,208.00 <br />D Regrade Impoundments and Diversions <br />0 <br />$0.00 <br />E Topsoil Replacement Cost <br />208.38 <br />$449,069.00 <br />F Revegetation Costs <br />182.31 <br />$100,142.00 <br />G Structure Demolition <br />8 <br />$3,885.03 <br />H Borehole Sealing <br />16 <br />$6,332.00 <br />I Site Maintenance; Rill and Gully Repair and Pond Cleaning <br />121.38 <br />$31,421.00 <br />J Mobilization and Demobilization <br />15.6 <br />$28,271.00 <br />Total Hours and Direct Cost <br />891.86 $1,232,319.03 <br />JLE 1 1/25/2016 <br />