Laserfiche WebLink
Page 26 of 26 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transnortation Cvcle Time: <br />Non- <br />Roadable <br />Equipme� <br />Haul Time (Hours): 0.40 <br />Return Time (Hours): 0.40 <br />Loading Time (Hours): 3.50 <br />Unloading Time (Hours): 3.50 <br />Subtotals: 7.80 <br />JOB TIME AND COST <br />Roadable <br />Eauinment <br />0.40 <br />0.40 <br />NA <br />NA <br />0.80 <br />BRIGHTON <br />20.00 miles <br />50.00 mph <br />$28,065.13 <br />$205.66 <br />Total job time: 15.60 Hours <br />Total job cost: $28,271 <br />CIRCES Cost Estimating Software <br />