Laserfiche WebLink
Task description: Haul tops <br />Site: Keenesburg Strip Mine <br />PROJECT IDENTIFICATION <br />SCRAPER TEAM WORK <br />to interior access roads <br />Permit Action: SL -08 <br />Task #: E05 State: Colorado <br />Date: 1/20/2016 County: Weld <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Permit/Job#: C1981028 <br />Abbreviation: None <br />Filename: C81 -E05 <br />COSTShift basis: 1 ner day <br />iption <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 3,500 Gal. <br />Cast Breakdown: Scraner Work Team Sunnort Eauinment Maintenance Eauipment <br />Total work team cost/hour: $1,327.34 <br />MATERIAL QUANTITIES <br />Initial volume: 15,488 CCY <br />Loose volume: 16,417 LCY <br />Source of estimated volume: 2008 ARR <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />25 <br />100 <br />25 <br />25 <br />Ownership cost/hour: <br />$110.90 <br />NA <br />$72.57 <br />$72.57 <br />$42.03 <br />$10.57 <br />Operating cost/hour: <br />$241.86 <br />NA <br />$35.60 <br />$142.41 <br />$17.44 <br />$9.05 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$39.02 <br />NA <br />$38.85 <br />$38.85 <br />$38.23 <br />$25.61 <br />Unit Subtotals: <br />$391.78 <br />NA <br />$147.02 <br />$253.83 <br />$97.69 <br />$45.24 <br />Number of Units: <br />2 <br />0 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$783.56 <br />Support: <br />$400.85 <br />Maint: <br />$142.93 <br />Total work team cost/hour: $1,327.34 <br />MATERIAL QUANTITIES <br />Initial volume: 15,488 CCY <br />Loose volume: 16,417 LCY <br />Source of estimated volume: 2008 ARR <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,850 lbs/LCY <br />Material description: <br />Sand - Damp <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />28.63 LCY <br />Swell factor: 1.060 <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />28.63 <br />LCY <br />