Laserfiche WebLink
BULLDOZER WORK <br />Task description: Push topsoil to powder magazine <br />Site: Keenesburg Strip Mine Permit Action: SL -08 Permit/Job#: C1981028 <br />PROJECT IDENTIFICATIOII <br />Task #: E03 <br />Date: 1/20/2016 <br />User: JLE <br />State: Colorado <br />County: Weld <br />Agency or organization name <br />DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C81 -E03 <br />Source of estimated volume: Division of Reclamation, Mining & Safe <br />Source of estimated swell <br />Cat Handbook <br />Utilization % <br />Ownership Cost/Hour: <br />$72.57 <br />NA <br />Operating Cost/Hour: <br />$142.41 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.85 <br />NA <br />Total unit Cost/Hour: $253.83 <br />Total Fleet Cost/Hour: $253.83 <br />MATERIAL QUANTITIES <br />Initial Volume: 370 <br />Swell factor: 1.060 <br />Loose volume: 392 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safe <br />Source of estimated swell <br />Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />60 feet <br />Unadjusted hourly <br />1,872.0 LCY/hr <br />production: <br />Materials consistency <br />Consolidated stockpile 1.0 <br />description: <br />Average push 0% <br />gradient: <br />Average site altitude: 4,000 feet <br />Material weight: 2,850 lbs/LCY <br />Weight description: Sand - Damp <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />