My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-20_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2016-01-20_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:45 PM
Creation date
1/25/2016 10:50:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
1/20/2016
Doc Name
Reclamation Cost Estimate
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
SL8
Email Name
TNL
DIH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Condition Correction: <br />Net Correction: 0.830 NA <br />Site Altitude: 4000 feet <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Rnute- <br />Seg # <br />Scraper <br />Push Dozer Source <br />Altitude Ad': <br />1.000 <br />NA CAT HB <br />Job Efficiency: <br />0.830 <br />NA CAT HB <br />Net Correction: 0.830 NA <br />Site Altitude: 4000 feet <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Rnute- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />1400.00 <br />1.00 <br />3.00 <br />4.00 <br />2394 <br />0.83 <br />Haul Time: 0.83 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade Roll. Res <br />Total Res <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />1400.00 <br />-1.00 3.00 <br />2.00 <br />2960 <br />0.60 <br />Return Time: 0.60 minutes <br />Total Scraper team cycle time: 3.03 minutes <br />Adjusted for job conditions: 941.16 LCY/Hour <br />Selected Number of Scrapers: 4 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,882.31 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,882.31 LCY/Hour <br />Unadjusted unit production/hour: 1,133.92 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) Total job time: <br />147.58 Hours <br />Unit cost: $1.178 /LCY Total job cost: $327,281 <br />
The URL can be used to link to this page
Your browser does not support the video tag.