My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-21_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-01-21_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:50 PM
Creation date
1/25/2016 10:19:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/21/2016
Doc Name
Adequacy Reclamation Cost Estimate Review
From
DRMS
To
Colowyo Coal Company
Type & Sequence
MR149
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 003 Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Haul Spoil to Collom Haul Road <br />Site: Colowyo Coal Mine Permit Action: MR 149 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 1/14/2016 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: I Cat 637G <br />-Dozer: I NA <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: CO 19-003 <br />COSTShift basis: mer day <br />iption <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Cost Breakdown: Scraner Work Team Sunnort Eouinment Maintenance Eouinment <br />Total work team cost/hour: $4,799.80 <br />MATERIAL QUANTITIES <br />Initial volume: 1,193,247 CCY Swell factor: 1.125 <br />Loose volume: 1,342,403 LCY <br />Source of estimated volume: Table 7 Exh. 13B -T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,650 lbs/LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 30.79 LCY <br />Scraner Bowl (volume) Basis: <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area Motor Grader Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA 25 25 <br />Ownership cost/hour: <br />$110.90 <br />NA <br />NA <br />NA $68.86 $20.53 <br />Operating cost/hour: <br />$243.12 <br />NA <br />NA <br />NA $22.92 $11.94 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA $0.00 $0.00 <br />Operator cost/hour: <br />$33.56 <br />NA <br />NA <br />NA $24.47 $0.00 <br />Unit Subtotals: <br />$387.59 <br />NA <br />NA <br />NA $116.24 $32.48 <br />Number of Units: <br />12 <br />0 <br />0 <br />0 1 1 <br />Group Subtotals: <br />Work: <br />$4,651.08 <br />Support: <br />$0.00 Maint: $148.72 <br />Total work team cost/hour: $4,799.80 <br />MATERIAL QUANTITIES <br />Initial volume: 1,193,247 CCY Swell factor: 1.125 <br />Loose volume: 1,342,403 LCY <br />Source of estimated volume: Table 7 Exh. 13B -T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,650 lbs/LCY <br />Material description: Decomposed rock - 25% Rock, <br />75% Earth <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 30.79 LCY <br />Scraner Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.