My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-21_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-01-21_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:50 PM
Creation date
1/25/2016 10:19:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/21/2016
Doc Name
Adequacy Reclamation Cost Estimate Review
From
DRMS
To
Colowyo Coal Company
Type & Sequence
MR149
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 004 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Site Altitude: 7500 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water. 1" tire penetration 4.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />NA <br />CAT HB <br />Job Efficiency: <br />0.830 <br />NA <br />CAT HB) <br />Site Altitude: 7500 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water. 1" tire penetration 4.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res Total Res <br />% % <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />6440.00 <br />-1.00 <br />4.00 3.00 <br />2800 <br />2.58 <br />Haul Time: 2.58 minutes <br />Return Route - <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />% <br />Total Res <br />% <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />6440.00 <br />1.00 <br />4.00 <br />5.00 <br />2795 <br />2.48 <br />Return Time: <br />2.48 <br />minutes <br />Total Scraper team cycle time: <br />6.66 <br />minutes <br />Adjusted for job conditions: <br />433.69 <br />LCY/Hour <br />Selected Number of Scrapers: <br />4 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />867.39 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />2,602.16 <br />LCY/Hour <br />Unadjusted unit production/hour: 522.52 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 3 Team(s) Total job time: <br />63.95 <br />Hours <br />Unit cost: $1.845 /LCY Total job cost: $306,928 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.