My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-22_REVISION - C1981014 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2016-01-22_REVISION - C1981014 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:54 PM
Creation date
1/25/2016 10:15:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
1/22/2016
Doc Name
Adequacy Response #3
From
Gorham Energy Consultants, LLC
To
DRMS
Type & Sequence
SL3
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sediment Demonstration — Mine Site - revised 1/22/2016 w/ 1/8/2016 addendum Page 6 <br />Section 3.03.1 <br />Length (ft) <br />Slope (%) <br />LS Factor <br />700 <br />6% <br />2.10 <br />Demo #1 Post weight RDA <br />Length (ft) <br />Slope (%) <br />LS Factors ave. <br />500/240 <br />3.4/24.4 <br />4.56 <br />Demo #2 Adjacent areas <br />Length (ft) <br />Slope (%) <br />LS Factors ave. <br />700/500/200/300 <br />6/6/25/8.3 <br />3.34 <br />Demo #2 Post weight RDA <br />Length (ft) <br />Slope (%) <br />LS Factors ave. <br />500/240 <br />3.4/24.4 <br />4.56 <br />C factor values specific to the RDA were used. The C factor for the RDA reference area is 0.02136. <br />The C factor for the RDA reclaimed area is 0.011. Factors for R, K, and P remain unchanged for <br />reasons previously discussed. <br />Demo #1 Pre -mine RDA footprint <br />A=RKLSCP <br />A = (24.7) (.32) (2.10) (.02136) (1.0) <br />A =.355 <br />Demo #1 Reclaimed RDA condition <br />A=RKLSCP <br />A = (24.7)(.32)(4.56)(.011)(1.0) <br />A = .396 <br />In this scenario, the results show that the reclaimed RDA individually produces more sediment than <br />the exact same area in the pre -mine condition. To overcome the influence of the increased LS factor <br />that result from construction of the approved RDA, the cover values on the reclaimed RDA would <br />need to be close to 85% cover for the output values to equalize. A summary of the results is shown <br />in Table 3 below. <br />Table 3 <br />RDA Annual Sediment Yield <br />tons/acre/year <br />Pre -mine RDA footprint .355 <br />Reclaimed RDA Condition .396 <br />However, when calculating the LS factor using the pre mine RDA footprint area and the actual <br />slopes from the immediate adjacent area that surrounds the RDA, the modeling output changes <br />significantly. Demonstration #2 uses information from the interpolated pre -mine topography of the <br />RDA footprint as well as from adjacent, non -mined lands surrounding the RDA area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.