Laserfiche WebLink
January 2016 <br />Energy Fuels Coal Inc. SL -04 Application for Partial Bond Release <br />TABLE 1 <br />BOND RELEASE ITEM <br />TYPE OF REQUESTED RELEASE <br />ACRES <br />DIRECT <br />COSTS <br />Road to MW -65 (permanent) <br />Phase 1, 11, and 111 <br />3.0 <br />$0 <br />MW -NW Road — North Spur only <br />Phase I, 11, and 111 <br />0.21 <br />$0 <br />Mine Permit Area <br />Liability Only <br />2,713.3 <br />$0 <br />Boreholes MW -NW, MW -16, and MW -23 <br />Sealed Boreholes - Bond Costs <br />0.0 <br />$2,488.11 <br />Boreholes MW -65, and SF -87-09 <br />Boreholes: SR -6, SR -9, SR -45, SR -47, SR -48, <br />SR -49, and SR -52 <br />Replace damaged Corley domestic well <br />Subsidence Holes - 2012 repair area <br />Site Maintenance (mine and loadout) <br />Mob/Demob Equipment for Remaining <br />Reclamation (mine and loadout) <br />Mob/Demob Equipment for Site <br />Maintenance (mine and loadout) <br />Boreholes, approved as permanent - 0.0 $4,502.26 <br />Bond Costs <br />Sealed Boreholes - Liability Only 0.0 $0 <br />Drill new well - Bond Costs 0.0 $2,578.00 <br />Liability Only 0.5 $0 <br />Bond Costs 0.0 $4,894.80 <br />Bond Costs 0.0 $7,084.00 <br />Bond Costs 0.0 $4,780.00 <br />TOTAL DIRECT COSTS $26,327 <br />INDIRECT COSTS (direct z 37.6%) $9,899 <br />TOTAL ESTIMATED BOND RELEASE REQUEST (Direct + Indirect) $36,226 <br />Page 9 <br />