My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-22_REVISION - M1986102
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986102
>
2016-01-22_REVISION - M1986102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:19 PM
Creation date
1/25/2016 9:06:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986102
IBM Index Class Name
REVISION
Doc Date
1/22/2016
Doc Name
Application AM01
From
Dan Collins / Collins-More-head, LLC
To
DRMS
Type & Sequence
AM1
Email Name
LJW
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
known to have the required equipment availability should be estimated. <br />These costs itemized in revised estimate under 6.3.4(2)(c) <br />(b) All items referenced in the Reclamation Plan must be included in the cost <br />calculation. These items in addition to earthwork, such as building demolition, <br />fencing, monitoring well sealing or stream channel reconstruction must also be <br />included in the reclamation cost estimate. <br />(c) After the direct costs noted above have been estimated, the Office may <br />add up to an additional maximum eighteen and one- half (18.5%) percent of <br />that total, which includes private contract, typical overhead costs. This additional <br />cost is required to cover indirect costs that an independent contractor would <br />incur when performing reclamation of the site. Five (5%) percent additional cost <br />shall be added to cover Office administration cost in the event of bond <br />forfeiture and permit revocation. <br />TASK LIST (Direct Costs + Indirect Costs). Revised by Collins -Morehead LLC <br />Task <br />Description <br />Form Used <br />Fleet Size <br />Hours <br />Cost <br />001 <br />Rip asphalt on access road <br />Ripper <br />1 <br />:25 <br />$42.00 <br />082 <br />Loader <br />1 <br />1.03 <br />$100:00 <br />003 <br />Pull down unstable spoil material onto <br />operating pad <br />Excavate <br />1 <br />14.88 <br />$957.00 <br />004 <br />Pull in berm at edge of operating pad, for <br />backfill <br />Excavate <br />1 <br />2.77 <br />$178.00 <br />004aIt <br />Install permanent steel/cable fence around <br />east perimeter of pad (160 ft. x 10.00 lin. foot) <br />Construction <br />- <br />$1600.00 <br />005 <br />-- .. <br />Dozer <br />1 <br />3.35 <br />85 <br />- . _ _ _ <br />e -portals <br />005alt <br />Permanently seal two westerly portals with <br />concrete block 300 square feet) x $7,00 sq/ft <br />-- <br />-- <br />$2,100.00 <br />006 <br />• - - - ' - ' - <br />Demolish <br />1 <br />:00 <br />$3, 961.57 <br />- - - - - - - - - , . <br />006aIt <br />Remove or dispose of onsite debris, etc. <br />Demolish <br />1 <br />.00 <br />$1,000.00 <br />007 <br />Push loadout fill material to portals, across <br />operating pad to level site <br />Dozer <br />1 <br />.70 <br />$116.00 <br />008 <br />• - - <br />Ripper <br />1 <br />2,71 <br />$446.O0 <br />:: - : : . : - : : - .: : : <br />soil <br />009 <br />• - . <br />Dozer <br />1 <br />066 <br />8819-00 <br />..• . . .. . _ .. <br />010 <br />" <br />Dozer <br />1 <br />$154:00 <br />... . .. _ _ - - - <br />ad <br />010att <br />Regrade access road, build waterbars, improve <br />drainage ditch and on-site water retention. <br />Dozer <br />1 <br />4 <br />$1,656.48 <br />nn11 <br />044 <br />Rcvcgctatc 1 2 a plan <br />�. <br />. ee <br />1 <br />p �� <br />8:00 <br />$2,364.00 <br />012 <br />Mobilize reclamation to site (sans Loader) <br />Mobilize <br />1 <br />7.00 <br />$3475.00 <br />SUBTOTALS (equipment/supplies/labor) 29.41 <br />SUBTOTALS (indirect costs/supervisor/insurance) -- <br />$11,082.48 <br />$5,603.87 <br />�n <br />
The URL can be used to link to this page
Your browser does not support the video tag.