My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-22_REVISION - M1986102
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986102
>
2016-01-22_REVISION - M1986102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:19 PM
Creation date
1/25/2016 9:06:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986102
IBM Index Class Name
REVISION
Doc Date
1/22/2016
Doc Name
Application AM01
From
Dan Collins / Collins-More-head, LLC
To
DRMS
Type & Sequence
AM1
Email Name
LJW
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
waters and design details such as liners, ponds and embankments, diversions <br />or chemical treatment facilities to be used to control these impacts, and ground <br />and surface water monitoring systems, to include proposed groundwater points <br />of compliance. <br />N/A <br />(c) Drainage Control: Describe the measures used to divert upland drainage <br />away from the site both during and after operation. This must include design <br />details demonstrating the capacity of ditches and impoundment structures to <br />contain operating solutions and the volume of water generated by a one <br />hundred (100) year 24- hour rainfall event. <br />N/A <br />(d) Maps and Plans: Design drawings must, at a minimum, describe specific <br />design details for tailing ponds and embankments, ponds and ditches, ore and <br />tail transport systems, and ground and surface water monitoring systems. <br />N/A <br />6.3.4 EXHIBIT D - Reclamation Plan <br />(1) The purpose of the Reclamation Plan is to describe the timing, procedures, <br />criteria and materials that will be used to reclaim the affected land to the <br />proposed future land use. This plan must be correlated to Exhibit E - Map. The <br />description of the Reclamation Plan must be adequate to satisfy the <br />requirements of Section 3.1 and demonstrate compliance with Rule 3. At a <br />minimum, the Application shall include the following information: <br />(a) specify at what point in the mining plan and to what depth(s) <br />overburden will be replaced in relation to ongoing extraction. <br />It is physically impossible to replace the overburden which was initially removed by Union <br />Carbide in the early 1960s. The overburden that was removed would correspond to the existing <br />"mine bench" as per map in Exhibit E. There is no plan to replace the overburden, per se. <br />N/A <br />(b) specify the maximum gradient of reclaimed slopes (horizontal: vertical). <br />If the Application proposes slopes steeper than 3:1, the <br />Operator/Applicant must include a justification that supports steeper <br />slopes for the proposed post mining land use, and demonstrates <br />compliance with the applicable performance standards of Section 3.1. <br />(c) specify the measures that will be taken to revegetate the site, if <br />applicable, including: <br />
The URL can be used to link to this page
Your browser does not support the video tag.