Laserfiche WebLink
August 18, 2015 <br />Mr. Steve Fancher <br />LOVELAND READY MIX <br />P.O. Box 299 <br />Loveland, CO 80539-0299 <br />RE: Resurvey of Gas Line Monitoring Points Batch Plant Site, Weld County Road 54 CDS Project <br />No. P02-1783 <br />Dear Mr. Fancher: <br />This letter is to state the results of the checking of the gas line monitoring points set in <br />March of 2002. <br />On August 6, 2015, a survey of Points 1 through 9 and i 1 through 23 showed no significant <br />difference or movement from the original survey. In previous surveys points 10 and 19 been <br />destroyed by some sort of construction and is no longer useable. <br />Currently, the extraction areas are adjacent to Points 1 through 23. <br />If you have questions regarding this information, please call our office. <br />Sincerely, <br />FOR AND ON BEHALF OF <br />CDS ENG ► EERING CORPORATION <br />M' hael J. DeD;. ker PLS 20676 <br />Sytrvev Supery sor <br />165 2nd Street S.W. • Loveland. CO 80537 (970) 667-8010 • Fax (970) 667-8024 • vvww.cds-eng.net <br />