Laserfiche WebLink
RECEIVED <br />Rocky Mountain Materials & Asphalt, Inc <br />Red Canyon Quarry JAIL 212016 <br />tslasting Han DIVIsON OF RECLAMATION <br />MINING AND SAFETY <br />The onsite Foreman will follow the following plan when blasting is to be initiated at Rocky Mountain <br />Materials' Red Canyon Quarry site. <br />1. Blasting Schedule. <br />• nut;fication to Blasting Company <br />• Scheduled Blast Date: J —/1-0'1.016 <br />I;ma: <br />&; Du <br />2. Notification of Outside Agencies.( Minimum 72 hrs. prior to blast event). <br />Colorado D;Yisioi, Of Reclamatiun, Mining & Safety <br />Tim Cazier 303-866-3567 Ext. 8169� K 6m) -{ <br />• Ken Bishop ( Adjoining rrepe,ty Owner) <br />Email: izenaniMynx.com <br />• Additional Notification <br />A. <br />B. <br />3. Ground Control. Radio communication will be mamtairiea at all times between the site foreman <br />and the lead bla�te,. <br />• Safety Briefing with Blasting Crew <br />Date: 1-71 l(a I; ... e: P.ocsKaM1 <br />Forman: 1� Blaster: Qovt. <br />• Access to Blast area closed <br />IIme: 8'00 6Y: <br />• Mine site cleared and access closed <br />I ime: 21.40-0 6r: 30 <br />• Blast Initiation <br />Time: oQ!SL by: J U <br />• Blast Area Cleared <br />Time ,3:00 By: <br />4. Blast Report: The blast report will be completed by the Certitied blaster in charge of the event <br />and will include, at minimum, the following information. <br />A. Ivline site <br />Date <br />Time <br />Location of Blast: I o include GPS coordinates of the initiatio,, point <br />